National Repository of Grey Literature 6 records found  Search took 0.00 seconds. 
CONSTRUCTION TECHNOLOGICAL PROJECT OF PREFABRICATED HALL IN PARDUBICE
Švub, Daniel ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
Diploma thesis deals with construction-technological project of prefabricated steel hall. I put emphasis on technological process of foundation structures. The time schedule of all processes, the cost estimation budget, the inspection and testing plan and the machine set designing are also contained. The building site equipment for excavation and rough superstructure and the coordination plan drawing with transportation roads is designed.
Execution of superstructure of an extension of a production hall in Veřovice
Šilhová, Kristýna ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of work is the solution of stage gross superstructure of production hall in the village of Veřovice. The work includes construction and technological report, site facilities, solving traffic routes from the production to the place of construction, tech-nological specification for prefabricated skeleton and sheathing, the most appropriate machine assembly, schedule, costing, inspection and test plan, safety work.
AUTOCENTRUM VW GROUP MIKULOV
Matoušková, Anna Marie ; Hudeček, Vladimír (referee) ; Dýr, Petr (advisor) ; Bečkovská, Tereza (advisor)
The bachelor's thesis is based on a previously prepared study of the Volkswagen Group Autocentre in the subject AG033 and expands it with DSP and DPS documentation. Proposed building is located on the outskirts of Mikulov. Solved area is surrounded by the field from one side and by the production and agricultural industries from the others. The land is located between Jiráskova and Republikánské obrany streets. New building was adapted in response to the sloping trapezoidal land so it was led parallel to the angle of the land. Car center is divided into three main units, interconnected to each other to maintain traffic between different parts of the object. The main part is made up of showroom, where new cars of four associated brands belonging to Volkswagen Group are presented. This part is also used for the sale of cars and the administration on the second floor. The third part of the building, which is provided to the warehouse, was inserted into the sloping part of the shoowroom and thus creates mass gradation of entire building. The warehouse is connected to sales point of spare parts and service where car repairs take place. In the service was designed background for mechanics, which includes changing rooms with sanitary facilities, living room and a technical room for the entire building. Parts of the car center are non-basement and single-storey except for offices in the shoowroom. The construction system is the same for all units. It is a ferroconcrete skeletal system with longitudinal trusses. The reinforcement was achieved by a rigid ceiling slab, which consists of a trapezoidal sheet metal with a concrete slab. Reinforcement is ensured by a reinforced concrete wall core. The building transfers the load to the reinforced concrete footings, which are interconnected by concrete strips in combination with drilled piles. Other vertical structures were created a glass facade system, Kingspan panels and plasterboard partitions in the interior. The horizont
AUTOCENTRUM VW GROUP MIKULOV
Matoušková, Anna Marie ; Hudeček, Vladimír (referee) ; Dýr, Petr (advisor) ; Bečkovská, Tereza (advisor)
The bachelor's thesis is based on a previously prepared study of the Volkswagen Group Autocentre in the subject AG033 and expands it with DSP and DPS documentation. Proposed building is located on the outskirts of Mikulov. Solved area is surrounded by the field from one side and by the production and agricultural industries from the others. The land is located between Jiráskova and Republikánské obrany streets. New building was adapted in response to the sloping trapezoidal land so it was led parallel to the angle of the land. Car center is divided into three main units, interconnected to each other to maintain traffic between different parts of the object. The main part is made up of showroom, where new cars of four associated brands belonging to Volkswagen Group are presented. This part is also used for the sale of cars and the administration on the second floor. The third part of the building, which is provided to the warehouse, was inserted into the sloping part of the shoowroom and thus creates mass gradation of entire building. The warehouse is connected to sales point of spare parts and service where car repairs take place. In the service was designed background for mechanics, which includes changing rooms with sanitary facilities, living room and a technical room for the entire building. Parts of the car center are non-basement and single-storey except for offices in the shoowroom. The construction system is the same for all units. It is a ferroconcrete skeletal system with longitudinal trusses. The reinforcement was achieved by a rigid ceiling slab, which consists of a trapezoidal sheet metal with a concrete slab. Reinforcement is ensured by a reinforced concrete wall core. The building transfers the load to the reinforced concrete footings, which are interconnected by concrete strips in combination with drilled piles. Other vertical structures were created a glass facade system, Kingspan panels and plasterboard partitions in the interior. The horizont
CONSTRUCTION TECHNOLOGICAL PROJECT OF PREFABRICATED HALL IN PARDUBICE
Švub, Daniel ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
Diploma thesis deals with construction-technological project of prefabricated steel hall. I put emphasis on technological process of foundation structures. The time schedule of all processes, the cost estimation budget, the inspection and testing plan and the machine set designing are also contained. The building site equipment for excavation and rough superstructure and the coordination plan drawing with transportation roads is designed.
Execution of superstructure of an extension of a production hall in Veřovice
Šilhová, Kristýna ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of work is the solution of stage gross superstructure of production hall in the village of Veřovice. The work includes construction and technological report, site facilities, solving traffic routes from the production to the place of construction, tech-nological specification for prefabricated skeleton and sheathing, the most appropriate machine assembly, schedule, costing, inspection and test plan, safety work.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.